Contact
Fire protection projects
Home / Projects

Our Projects

A selection of fire protection projects delivered across commercial, residential, industrial and specialist environments.

Placeholder projects. These are representative examples used during development. Actual project details, images and case studies will replace these once available.

Commercial tower
CommercialDesign & Installation

25-Storey Commercial Tower, Canary Wharf

London, E14

Full wet pipe sprinkler design and installation across 25 floors of Grade A office space, coordinated with the main contractor throughout a 14-month programme.

Residential apartments
ResidentialDesign & Installation

186-Unit Apartment Development, Salford Quays

Manchester, M50

Residential sprinkler systems across three blocks including communal areas, risers and individual apartments, delivered to BS 9251 standards.

Distribution warehouse
IndustrialDesign & Installation

120,000 sq ft Distribution Centre, Erdington

Birmingham, B24

ESFR sprinkler system designed for high-bay racking storage up to 12 metres, coordinated around live logistics operations.

Data centre
SpecialistDesign & Installation

Tier 3 Data Centre, Slough

Slough, SL1

Pre-action and gas suppression systems across multiple server halls, designed around critical uptime requirements and coordinated with MEP teams.

Retail environment
CommercialDesign & Installation

Mixed-Use Retail & Office Scheme, Leeds

Leeds, LS1

Wet pipe sprinkler systems across 45,000 sq ft of retail and commercial space, delivered within an occupied city centre development.

Office interior
CommercialMaintenance

Multi-Site Office Portfolio, City of London

London, EC2

Planned maintenance and compliance testing across a portfolio of seven commercial office buildings, providing quarterly inspections and annual servicing.

Residential development
ResidentialUpgrades

Residential Retrofit, Harbourside

Bristol, BS1

Retrofit sprinkler installation across an occupied 14-storey residential tower, phased around resident access and completed within a 10-week programme.

Manufacturing facility
IndustrialDesign & Installation

Automotive Manufacturing Facility, Sunderland

Sunderland, SR5

Deluge and wet pipe systems across production halls and paint shop areas, installed during planned shutdown periods to minimise operational impact.

Care facility
ResidentialDesign & Installation

72-Bed Care Facility, Guildford

Guildford, GU1

Residential mist suppression system designed for a new-build care home, coordinated with the developer and M&E contractor from RIBA Stage 3.

Electrical infrastructure
SpecialistMaintenance

HV Switchgear Rooms, National Grid

Various UK Sites

Ongoing gas suppression maintenance across multiple high-voltage switchgear environments, including six-monthly inspections and annual discharge testing.

Hotel
CommercialUpgrades

220-Room Hotel Refurbishment, Edinburgh

Edinburgh, EH1

Complete sprinkler system upgrade across all guest floors and back-of-house areas, phased floor-by-floor around ongoing hotel operations.

Logistics warehouse
IndustrialMaintenance

Logistics Portfolio, East Midlands Gateway

Leicestershire, DE74

Annual servicing and compliance support across four distribution warehouses totalling 480,000 sq ft, including pump testing and valve inspections.

Commercial building
Start a Project

Ready to Discuss Your Project?

Whether you're planning a new installation, need maintenance support or have an urgent requirement, we're here to help.